ROTATION CALENDAR

28/14 (4/2) roster calendar 2027

The 28/14 (4/2) roster calendar 2027 calendar repeats 28 on · 14 off from the first duty date you enter. It counts scheduled duty and rest dates; travel, trades, overtime and approved leave remain separate.

A 28/14 roster repeats 28 duty dates followed by 14 off dates. Enter the first date of the 28-day work block to place this 42-day sequence on your calendar.

Your year at a glance

Enter your confirmed first duty date; this calculation uses 28 on · 14 off. Calculations run in your browser.

Build your dated roster calendar

This example repeats 28 on · 14 off. Choose its real anchor in the calculator before comparing work blocks across 2027.

Whole-year view42-day cycle projected against 2027 dates.
Real-world changesCheck exceptions against your confirmed duty/rest roster.
Leave planningCompare the actual rest blocks with your partner’s dates.
Open this pattern →

28/14 (4/2 weeks): average hours and days home

These are cycle averages over 365 days. The dated calendar below counts whole dates in a specific year and can differ with your anchor.

Hours per duty dayWork days/yearDays home/yearHours/yearAverage hours/week
10 h243.3121.72,43346.7
11 h243.3121.72,67751.3
12 h243.3121.72,92056.0

Assumptions: Cycle averages use a 365-day year, every rostered duty day worked, no overtime and no leave. Travel days count as off. Days home means modeled off dates, not a guarantee of time at home. Values are rounded only for display. Weekly hours use the duty fraction × 7 × shift hours; a 365-day year is longer than 52 weeks. Day totals rounded separately may differ slightly from 365 when added.

How to use this roster calendar

  1. Confirm the full sequence. Check that 28 on · 14 off matches your published roster, including any day and night duties.
  2. Enter the first duty date. Use the first duty date of the opening work block, then choose the calendar year.
  3. Review the dated result. Calculate duty and rest days, then check travel, overrides and employer approval before planning leave.

28/14 (4/2) roster calendar 2027 illustrative annual totals: 2027 annual example

Assumptions: the first date of the complete sequence is 1 Jan 2027; 28 on · 14 off; no travel-day allocation, overrides or leave taken. A duty day is a calendar date marked by the repeating work/rest cycle, not a shift-hours calculation.

MonthDuty daysRest days
January283
February1711
March1714
April228
May256
June1614
July1714
August265
September219
October1714
November1812
December283
2027 total252113

These counts change if the first duty date changes. Calculate your actual annual totals using the interactive planner. They are whole dates in this calendar year, not cycle averages.

Example calendar subscription

This fixed example starts on 1 Jan 2027. Changing the calculator inputs does not change this example link.

Download / subscribe via HTTPS · Subscribe with Apple Calendar (webcal)

Compare two rotation schedules →

2027 public holiday reference

Nationwide public holidays do not convert scheduled duty into time off. Regional holidays and employer rules may differ.

2027 pattern facts for 28/14 (4/2) roster calendar 2027

Using 1 Jan 2027 as the first duty date, the sequence 28 on · 14 off contains 113 rostered rest dates in 2027, with a longest uninterrupted rest stretch of 14 days inside the calendar year. That starting point is illustrative, not your employer’s published duty roster.

Across all 42 equally weighted possible starting phases, the entire 24–26 Dec Christmas period is free in 12 phases (28.6%); 31 Dec through 1 Jan is free in 13 phases (31.0%).

For illustrative summer-school intervals, the mean number of rostered rest dates is 14.0 of 42 dates for an Australian December–January example, 14.0 of 42 for a UK July–August example, and 20.7 of 62 for a US June–August example. These fixed windows are not official countrywide school calendars and do not include travel or approved leave.

Review complete 2027 holiday odds and methodology →

Planning notes specific to 28/14 (4/2) roster calendar 2027

The same ratio, in longer blocks

Four weeks on and two weeks off puts two-thirds of the cycle on duty. That is the same duty share as 14/7, but the dates come in blocks twice as long. A comparison based only on annual hours will therefore miss a practical difference: 28/14 places fourteen consecutive off dates together, while 14/7 places seven.

At 12 hours per duty date, one complete 42-day cycle contains 336 scheduled work hours. The cycle average is 56 hours per week and 2,920 hours per 365-day year. Your dated annual calendar can contain a different number of duty dates because the year may cut through a work or off block.

Place the full swing before planning leave

Start with a confirmed day 1 of the work block. From that anchor, the first off date is 28 days later and the next work block begins 42 days later. Check those two boundaries against your published roster before using the calendar to choose a trip.

For two people on different rotations, a long off block can overlap several shorter cycles. Compare both anchors and the exact dates of each person’s time off. Any leave request should identify the duty dates being changed, while travel and shift handovers still need to fit around the proposed break.

Frequently asked questions

Does 4/2 mean four days on and two days off?

On this page, 4/2 means four weeks on and two weeks off: 28 duty dates, then 14 off dates. Use the explicit 28/14 numbers when checking your inputs.

How many hours are in one work block?

At 12 hours per duty date, 28 duty dates give 336 hours. At 10 hours they give 280 hours, and at 11 hours they give 308 hours.

Why can my annual calendar differ from 2,920 hours?

The 2,920 figure is the 365-day cycle average at 12 hours per duty date. A specific year starts and ends at particular positions in the 42-day cycle, so its count of duty dates is an integer and can differ.

Which date should I use as the anchor?

Use the first duty date of a confirmed 28-day work block. A date partway through the block needs its correct sequence position before it can serve as an anchor.

Compare all rotation roster patterns →