ROTATIONLIFE
EN
← RotationLife
ROTATION CALENDAR

9/5 rotation calendar 2027

The 9/5 rotation calendar 2027 calendar repeats 9 on · 5 off from the first duty date you enter. It counts scheduled duty and rest dates; travel, trades, overtime and approved leave remain separate.

Here, 9/5 means nine consecutive duty dates followed by five off dates. These numbers describe days in the roster; they are not a 9 am–5 pm shift time.

Your year at a glance

Enter your confirmed first duty date; this calculation uses 9 on · 5 off. Calculations run in your browser.

Build your dated roster calendar

This example repeats 9 on · 5 off. Choose its real anchor in the calculator before comparing work blocks across 2027.

Whole-year view14-day cycle projected against 2027 dates.
Real-world changesCheck exceptions against your confirmed duty/rest roster.
Leave planningCompare the actual rest blocks with your partner’s dates.
Open this pattern →

9 on / 5 off: average hours and days home

These are cycle averages over 365 days. The dated calendar below counts whole dates in a specific year and can differ with your anchor.

Hours per duty dayWork days/yearDays home/yearHours/yearAverage hours/week
10 h234.6130.42,34645.0
11 h234.6130.42,58149.5
12 h234.6130.42,81654.0

Assumptions: Cycle averages use a 365-day year, every rostered duty day worked, no overtime and no leave. Travel days count as off. Days home means modeled off dates, not a guarantee of time at home. Values are rounded only for display. Weekly hours use the duty fraction × 7 × shift hours; a 365-day year is longer than 52 weeks. Day totals rounded separately may differ slightly from 365 when added.

How to use this roster calendar

  1. Confirm the full sequence. Check that 9 on · 5 off matches your published roster, including any day and night duties.
  2. Enter the first duty date. Use the first duty date of the opening work block, then choose the calendar year.
  3. Review the dated result. Calculate duty and rest days, then check travel, overrides and employer approval before planning leave.

9/5 rotation calendar 2027 illustrative annual totals: 2027 annual example

Assumptions: the first date of the complete sequence is 1 Jan 2027; 9 on · 5 off; no travel-day allocation, overrides or leave taken. A duty day is a calendar date marked by the repeating work/rest cycle, not a shift-hours calculation.

MonthDuty daysRest days
January2110
February1810
March2110
April2010
May1912
June1812
July2011
August2110
September2010
October2011
November1812
December1912
2027 total235130

These counts change if the first duty date changes. Calculate your actual annual totals using the interactive planner. They are whole dates in this calendar year, not cycle averages.

Example calendar subscription

This fixed example starts on 1 Jan 2027. Changing the calculator inputs does not change this example link.

Download / subscribe via HTTPS · Subscribe with Apple Calendar (webcal)

Compare two rotation schedules →

2027 public holiday reference

Nationwide public holidays do not convert scheduled duty into time off. Regional holidays and employer rules may differ.

2027 pattern facts for 9/5 rotation calendar 2027

Using 1 Jan 2027 as the first duty date, the sequence 9 on · 5 off contains 130 rostered rest dates in 2027, with a longest uninterrupted rest stretch of 5 days inside the calendar year. That starting point is illustrative, not your employer’s published duty roster.

Across all 14 equally weighted possible starting phases, the entire 24–26 Dec Christmas period is free in 3 phases (21.4%); 31 Dec through 1 Jan is free in 4 phases (28.6%).

For illustrative summer-school intervals, the mean number of rostered rest dates is 15.0 of 42 dates for an Australian December–January example, 15.0 of 42 for a UK July–August example, and 22.1 of 62 for a US June–August example. These fixed windows are not official countrywide school calendars and do not include travel or approved leave.

Review complete 2027 holiday odds and methodology →

Planning notes specific to 9/5 rotation calendar 2027

A fortnight with nine duties

The full cycle lasts fourteen days. Nine dates are on duty and five are off, so the average duty share is nine-fourteenths of the cycle. At 12 hours per duty date, one complete cycle contains 108 work hours and averages 54 hours per week.

Across a 365-day comparison year, that ratio gives about 234.6 duty dates, 130.4 off dates and 2,816 work hours. A dated calendar can show a different whole-day total depending on the position of New Year within the sequence.

Check the start and end of the five-day break

With the anchor at duty day 1, the first off date is nine calendar days later. The next work block begins fourteen days after the anchor. Those boundaries identify the five nominal off dates; release time, flights and the following shift still determine how much of that interval is usable.

The cycle returns to the same weekday every two weeks. That makes its pattern different from an eight-day four-on, four-off cycle, which moves through weekdays. When comparing options, inspect the actual five-day off block as well as the annual-hours figure.

Frequently asked questions

Does 9/5 mean a nine-to-five job?

On this page it means nine duty days followed by five off days. The hours comparison states a separate assumption for the length of each duty.

How many work hours are in a complete cycle?

At 12 hours for each of nine duties, the cycle contains 108 work hours over fourteen calendar days. Its weekly average is 54 hours.

Do the same weekdays repeat?

The fourteen-day cycle starts on the same weekday every two weeks. Individual duties and off dates still depend on the confirmed day-1 anchor.

Why does my calendar not show 234.6 work days?

The 234.6 figure is the rounded average for 365 days. A particular anchored calendar contains a whole number of duty dates and can differ from the average.

Compare all rotation roster patterns →

Packing for your next swing?